logo

Construction of New OPD Block 200 Bed ward Basement + GF + 6 Floors at the location of old OPD block, at existing ESIC Hospital/ Medical college campus, Sanathnagar, Hyderabad

Sector: Commercial • Location: Sanathnagar, Telangana, India

Source: India Investment Grid (IIG)

Project
Closed

Information Employee's State Insurance Company [ESIC] has come up with Construction of New OPD Block 200 Bed ward Basement + GF + 6 Floors at the location of old OPD block, at existing ESIC Hospital/ Medical college campus, Sanathnagar, Hyderabad with a ticket size of 211.13 INR Crores. This project in Medical Infrastructure sub-sector involves The current status of the project is Notice to Proce

Project Information FAQ

Project Information

5 Q
The project “Construction of New OPD Block 200 Bed ward Basement + GF + 6 Floors at the location of old OPD block, at existing ESIC Hospital/ Medical college campus, Sanathnagar, Hyderabad” is an infrastructure initiative in the Commercial sector, located in Sanathnagar, Telangana, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Employee's State Insurance Company [ESIC] has come up with Construction of New OPD Block 200 Bed ward Basement + GF + 6 Floors at the location of old OPD block, at existing ESIC Hospital/ Medical college campus, Sanathnagar, Hyderabad with a ticket size of 211.13 INR Crores. This project in Medical Infrastructure sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Construction of New OPD Block 200 Bed ward Basement + GF + 6 Floors at the location of old OPD block, on EPC basis with Civil works including Internal water supply, & Sanitary Installations, Sewerage system, Drainage & Development of Site, Internal Roads & Paths, External sewer lines, External water supply lines, Storm water drains, Rain water harvesting pits, Boundary wall, Over head tank without independent staging, UG Sump etc., and Internal & External Electrical Installations, Fans, Power wiring and plugs, Central call bell system, Lightening conductors, Telephone conduits, LED Street lighting, Illuminated Signages, Data Networking/wifi, Water supply pumpsets, Fire fighting with wet riser and sprinkler system, Automatic Fire Alarm system, SITC of Lifts, Online 3 phase UPS system, HVAC & Pressurised mechanical ventilation system, Solar water heating system, IP based CCTV System, IP based EPABX system, Integrated Building Management System, Audio-Visual / conference system, Medical Gas Pipe line system and Nursing call system etc. at existing ESIC Hospital/ Medical college campus, Sanathnagar, Hyderabad.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data