Construction of new Ridgetown to Highgate Transmission Main, Highgate Storage Tank incl. Booster Station
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
This is to design and construct a new 10 km long 200 mm diameter water main to convey treated water to the township of Highgate and an approximately 250 m3 capacity water storage tank to meet both daily peak as well as any unexpected demand, rechlorination system and booster pumping station at Highgate.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Construction of new Ridgetown to Highgate Transmission Main, Highgate Storage Tank incl. Booster Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is to design and construct a new 10 km long 200 mm diameter water main to convey treated water to the township of Highgate and an approximately 250 m3 capacity water storage tank to meet both daily peak as well as any unexpected demand, rechlorination system and booster pumping station at Highgate. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
