logo

Construction of Phase 1 of Lavergne - Joliet - Ste Cecile Integrated Road-Water-Sewer Renewal Project

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The sanitary sewers within the defined project limits were largely built in the 1930s and 1940s. They range in size from 200 mm to 900 mm. There are approximately 50 sewer segments with a total length of approximately 2100 metres. The sewers are generally in poor to very poor condition. The watermains were built in the 1930s and 1940s ranging in size from 52 mm to 203mm. The total length is approx

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Road, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Construction of Phase 1 of Lavergne - Joliet - Ste Cecile Integrated Road-Water-Sewer Renewal Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Construction of Phase 1 of Lavergne - Joliet - Ste Cecile Integrated Road-Water-Sewer Renewal Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The sanitary sewers within the defined project limits were largely built in the 1930s and 1940s. They range in size from 200 mm to 900 mm. There are approximately 50 sewer segments with a total length of approximately 2100 metres. The sewers are generally in poor to very poor condition. The watermains were built in the 1930s and 1940s ranging in size from 52 mm to 203mm. The total length is approximately 2200 metres. The sanitary sewers in Lavergne St, Garneau St, Ferland St, Frechette St, Jolliet Ave, Ste. Cecile St, Montfort St, Hector-Hotte Way, Ste Monique St and Perrier Ave require replacement due to condition, maintenance issues and historical basement flooding. The watermains require replacement due to age and the presence of lead services. The majority of storm sewers are in good condition, however, the storm sewers in Ste. Cecile St from Beechwood Ave to Ste. Monique St, Garneau St from Lavergne St to Jolliet Ave, Ferland St from Lavergne St to Jolliet Ave, and Perrier Ave will need to be replaced. Full road reconstruction including curbs and sidewalks will be included as required and trench reinstatement with resurfacing will be implemented where feasible.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Road, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project