Construction of Ravine Stabilization and Pond Dredging
Sector: Electric Vehicles (EVs) • Location: Saint Paul, Minnesota, United States of America
Source: Dodge USA
the work consists of the construction of ravine stabilization and pond dredging with approximately the following quantities: 5 LS Mobilization and Demobilization 120 EA Tree Removal 0.95 AC Clearing and Grubbing 60 CY Muck Excavation - Offsite (EV) 3555 CY Muck Excavation - Offsite (EV) (Contaminated) 2 EA 48 Flared End Section 7 EA Repair Storm Structure 4 EA Repair Flared End Section 260 CY Rand
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Water Supply and Storage, Waste Processing and Treatment, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Construction of Ravine Stabilization and Pond Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the work consists of the construction of ravine stabilization and pond dredging with approximately the following quantities: 5 LS Mobilization and Demobilization 120 EA Tree Removal 0.95 AC Clearing and Grubbing 60 CY Muck Excavation - Offsite (EV) 3555 CY Muck Excavation - Offsite (EV) (Contaminated) 2 EA 48 Flared End Section 7 EA Repair Storm Structure 4 EA Repair Flared End Section 260 CY Random Riprap 100 TON 24 Boulders 5 LS Dewatering Together with Miscellaneous Erosion Control, Salvag... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Water Supply and Storage, Waste Processing and Treatment, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- PV SOLAR ROOF MOUNT SYSTEM: (15) 400W MODULES AT 6 KW TOTAL. INSTALL EV CHARGER.
- MGM Tobacco Certificate of Nonconforming Use
- Tasman East - 5123 Calle Del Sol (Ensemble)
- The College of Southern Nevada's CONNECTIVITY CONCIERGES
- Construction of a manufacturing facility for electric vehicle batteries for Panasonic Energy in De Soto, Kansas (United States)
- MAYFIELD TO JEWEL ROAD
- FY2008 Discretionary Grants for the Family Violence Prevention and Services Program
- 122402 MILLS AVE NE Citywide Alley Restoration
