Construction of Remaining approach Road for Shahid Buddijibi Shetu (3rd Burigonga Bridge) to connect Atibazar including Replacement of 3 old Bridge at Konakhola (keranigonj)-Kholamora-Hazratpur-Itabara-Hemayetpur Road (Z-8002).
Sector: Bridge • Location: Bangladesh
Source: Reconnecting Asia
Construction of Remaining approach Road for Shahid Buddijibi Shetu (3rd Burigonga Bridge) to connect Atibazar including Replacement of 3 old Bridge at Konakhola (keranigonj)-Kholamora-Hazratpur-Itabara-Hemayetpur Road (Z-8002).
- Sector
- Bridge, Road, Manufacturing (Industrial)
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- Reconnecting Asia
ConstructChat
Ask ConstructChat about Construction of Remaining approach Road for Shahid Buddijibi Shetu (3rd Burigonga Bridge) to connect Atibazar including Replacement of 3 old Bridge at Konakhola (keranigonj)-Kholamora-Hazratpur-Itabara-Hemayetpur Road (Z-8002).
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of Remaining approach Road for Shahid Buddijibi Shetu (3rd Burigonga Bridge) to connect Atibazar including Replacement of 3 old Bridge at Konakhola (keranigonj)-Kholamora-Hazratpur-Itabara-Hemayetpur Road (Z-8002). |
Original sector | Road |
Location
Country | Bangladesh |
Source
Source reliability | Medium |
Source | Reconnecting Asia |
More Details
Record type | Project |
Sector | Bridge, Road, Manufacturing (Industrial) |
Article published date | 2023-11-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
