logo

Construction of Signature Bridge between Dwarka & bey Dwarka and its approaches in the State of Gujarat on EPC Mode.

Sector: Bridge • Location: Devbhoomi Dwarka, Gujarat, India

Source: India Investment Grid (IIG)

Project
Closed

Information State PWD has come up with Construction of Signature Bridge between Dwarka & bey Dwarka and its approaches in the State of Gujarat on EPC Mode. with a ticket size of 962.43 INR Crores. This project in Roads & Bridges sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project Total length of 4 lane Brid

Project Information FAQ

Project Information

5 Q
The project “Construction of Signature Bridge between Dwarka & bey Dwarka and its approaches in the State of Gujarat on EPC Mode.” is an infrastructure initiative in the Bridge sector, located in Devbhoomi Dwarka, Gujarat, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information State PWD has come up with Construction of Signature Bridge between Dwarka & bey Dwarka and its approaches in the State of Gujarat on EPC Mode. with a ticket size of 962.43 INR Crores. This project in Roads & Bridges sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project Total length of 4 lane Bridge is 4.772 Km, which includes approach bridge of Length 1.42 Km, Cable stayed bridge of 0.9 km and approach road on both Okha and Beyt end of 1.241 Km & 1.211 Km respectively. The project also includes development of parking area on both Okha & Beyt side.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data