Construction of Six New EPR2 Nuclear Reactors by EDF
Sector: Nuclear • Location: France
Source: Modern Ghana
The project involves the construction of six new generation EPR2 nuclear reactors with a total capacity of just under 10,000 Megawatts. These reactors will be built in three pairs at three existing nuclear plants: Penly, Gravelines, and Bugey. The construction costs are estimated at about €73 billion, with commissioning planned between 2038 and 2044.
- Status
- Prospective
- Sector
- Nuclear, Power Generation (CCGT), Government
- Location
- France
- Updated
- 22 Jul 2026
- Source
- Modern Ghana
ConstructChat
Ask ConstructChat about Construction of Six New EPR2 Nuclear Reactors by EDF
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of six new generation EPR2 nuclear reactors with a total capacity of just under 10,000 Megawatts. These reactors will be built in three pairs at three existing nuclear plants: Penly, Gravelines, and Bugey. The construction costs are estimated at about €73 billion, with commissioning planned between 2038 and 2044. |
Original sector | Energy |
Budget |
Location
Country | France |
Source
Source | Modern Ghana |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT), Government |
Article published date | 2026-04-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
