Construction of the new National Load Dispatch Center
Sector: Power Transmission • Location: France
Source: Proparco Groupe AFD (Agence Française de Développement)
The existing LDC system cannot deal with the challenges that the sector has to face in the coming years in terms of sizing, performance, functionality and maintainability. Commissioned eight years ago, it was in fact conceived 13 years ago based on a power system of a small size (which has increased more than fivefold in generation capacity since then).As a result, newly built power plants in Ethi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The existing LDC system cannot deal with the challenges that the sector has to face in the coming years in terms of sizing, performance, functionality and maintainability. Commissioned eight years ago, it was in fact conceived 13 years ago based on a power system of a small size (which has increased more than fivefold in generation capacity since then).As a result, newly built power plants in Ethiopia (dams, windfarms…) cannot be linked to the current dispatch center and cannot be controlled as smoothly as if theywere fully integrated. The need of a new LDC is not questionable at this stage, as it will improve the automation level in operation for enhancing reliability, stability, security and quality of the power system.This National Load Dispatch Center Project (NLDCP) is part of the National Grid Infrastructure Development Project (NGIDP) which also comprises the upgrading ofsubstations and the improvement of the transmission network. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
