Construction of the Roberts Ww Collection Improvements
Sector: Water Supply and Storage • Location: Roberts, Idaho, United States of America
Source: Dodge USA
Project consists of replacing the existing Lift Station, 20 sewer manholes, approximately 5,570 ft of 8-inch sewer lines, 55 ft of 12-inch sewer with associated curb, gutter and asphalt repairs. The lift station includes all associated electrical work and pump installs, and installation of new storm water manhole. Total asphalt repair is approximately 7,770 square yards. It is anticipated that dew
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial
- Location
- Roberts, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Construction of the Roberts Ww Collection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of replacing the existing Lift Station, 20 sewer manholes, approximately 5,570 ft of 8-inch sewer lines, 55 ft of 12-inch sewer with associated curb, gutter and asphalt repairs. The lift station includes all associated electrical work and pump installs, and installation of new storm water manhole. Total asphalt repair is approximately 7,770 square yards. It is anticipated that dewatering will be required in areas where the depth of excavation is below the water table elevation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Roberts |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
