logo

Construction Skills School / EBBA

Sector: Education

Source: ArchDaily

Project
Closed

The success of the project has been in being able to create an identity for the site that connects with an idea about making and relates directly to the training school. Architecture suffers from the loss of the experience of assembly and the intention was for this to be legible in the final result. We wanted to see an expression of lots of things being made as a way to connect to the site. EBBA’s

Project Information FAQ

Project Information

3 Q
The project “Construction Skills School / EBBA” is an infrastructure initiative in the Education sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The success of the project has been in being able to create an identity for the site that connects with an idea about making and relates directly to the training school. Architecture suffers from the loss of the experience of assembly and the intention was for this to be legible in the final result. We wanted to see an expression of lots of things being made as a way to connect to the site. EBBA’s involvement in the project included the production of large-scale models and prototypes that helped to ensure the project could be realized and delivered on budget, as well as working alongside skilled makers to see the scheme come together.In addition, the design addresses the organization of the site as a cluster of buildings in order for them to read coherently from different vantage points. A playful composition of different screen densities alternate between open and closed depending on whether they are exterior or interior facing elevations. This results in less material being used for the elevations that look into the courtyard space. Overall the ambition was to create a temporary system that can be easily disassembled, recycled, and reused at the end of its life.Text description provided by the architects.EBBA have been working with theLondonLegacy Development Corporation on an exciting project to deliver a center for construction skills learning. In collaboration with CITB and TFL, the construction school provides the opportunity for people to be sponsored through practical education and training. Phase 1 of the construction skills school was completed in the summer of 2021. EBBA have helped to deliver the project after being appointed to design the scheme for the Olympic Park. The public scheme, which will be run by the Construction Industry Training Board and the Skills Centre, is set to be in use for the next 4 years and will provide valuable skills based on “hands-on” learning to local people in the area.EBBA wanted to create a lively architecture that would reflect the activities of its occupants. Using their experience of working on low-cost projects to develop a strategy that could achieve a high quality and refined result with very simple means. For EBBA, it is important to take care in the creation of all building types, even those for temporary use, as they have a vital role in the development of areas and can bring delight to those that experience them.The ambition was to create an active frontage to allow views of the activities inside the construction skills center while also making a building that responded to the changing area. The strong visual language helps to create a marker that bounds the edge and diffuses the conditions between the industrial views to the North and the natural picturesque scenes along the canal.The brief asked for an innovative, sustainable solution to cladding three classroom blocks on the site, to be built in two phases. The requirements included the need for a limited amount of maintenance and flexibility enough that the design could adjust to the repurposed cabins being donated to the project. In addition, the design brief sought ideas for the landscaping around the site and its boundary treatment to this edge of the park, which provides a gateway to people approaching Hackney Wick.The language of frames and screens that were designed to easily clad the exterior of the cabins enable a sense and understanding of the building being made of an assembly of components. The cabins were repurposed and required a simple way to rationalize each of the elevations so that they would read as one complete building. The repetitive system allows the flexibility to adjust to the spacing of the windows on the different cabins, while also enabling it to be installed rapidly.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data