Construction Utility Improvements to Servebluff Springs Ph 3
Sector: Water Supply and Storage • Location: Ferris, Texas, United States of America
Source: Dodge USA
.Project scope shall include the Utility Improvements, approximately 11,155 LF of12 and 8 water, 22,678 LF of 30 to 8 sanitary sewer and 16 force main, and6,722 LF of 2-barrel 7 x 5 RCB through 18 RCP storm sewer, all per NCTCOG,Construction Plans, and City of Ferris specifications to serve 260 lots onapproximately 59 acres. The project is located East of the intersection of F.M.664 and Tanner Far
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Raw Materials, Power Transmission, Residential, Waste Processing and Treatment, Power Generation (CCGT)
- Location
- Ferris, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Construction Utility Improvements to Servebluff Springs Ph 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | .Project scope shall include the Utility Improvements, approximately 11,155 LF of12 and 8 water, 22,678 LF of 30 to 8 sanitary sewer and 16 force main, and6,722 LF of 2-barrel 7 x 5 RCB through 18 RCP storm sewer, all per NCTCOG,Construction Plans, and City of Ferris specifications to serve 260 lots onapproximately 59 acres. The project is located East of the intersection of F.M.664 and Tanner Farm Rd. in City of Ferris ETJ, Ellis County, Texas . |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Ferris |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Raw Materials, Power Transmission, Residential, Waste Processing and Treatment, Power Generation (CCGT) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
