logo

Consultancy and Design for Bridge and Bypass in Tanzania

Sector: Bridge • Location: Dar es Salaam, Tanzania

Source: Highways Today

Project
Ongoing

The Government of the United Republic of Tanzania has received loans from the African Development Bank (AfDB) towards the cost of undertaking their Transport Sector Support Programme (TSSP) and intends to use part of the funds to carry out Consultancy Services for Feasibility Study, Environmental & Social Impact Assessment, Detailed Engineering Design and Preparation of Tender Documents for Constr

Project Information FAQ

Project Information

4 Q
The project “Consultancy and Design for Bridge and Bypass in Tanzania” is an infrastructure initiative in the Bridge sector, located in Dar es Salaam, Tanzania. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Government of the United Republic of Tanzania has received loans from the African Development Bank (AfDB) towards the cost of undertaking their Transport Sector Support Programme (TSSP) and intends to use part of the funds to carry out Consultancy Services for Feasibility Study, Environmental & Social Impact Assessment, Detailed Engineering Design and Preparation of Tender Documents for Construction of a Bridge and Its Approach Roads to Bypass Mtera Dam and the Babati Town Bypass Road (15.5 Km). The scope of services included under this project comprises two phases: Phase I: Feasibility Study including the Preliminary Design, Cost Estimates, Preliminary Environmental & Social Impacts and development of Preliminary Resettlement Action Plan and Survey of Properties to be affected. Phase II: Detailed Engineering Design, including Detailed Environmental and Social Impact Assessment, Development of Resettlement Action Plan and Preparation of Bidding Documents. The duration of the assignment is 14 months after commencement of the services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data