Consultancy and Design for Bridge and Bypass in Tanzania
Sector: Bridge • Location: Dar es Salaam, Tanzania
Source: Highways Today
The Government of the United Republic of Tanzania has received loans from the African Development Bank (AfDB) towards the cost of undertaking their Transport Sector Support Programme (TSSP) and intends to use part of the funds to carry out Consultancy Services for Feasibility Study, Environmental & Social Impact Assessment, Detailed Engineering Design and Preparation of Tender Documents for Constr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Government of the United Republic of Tanzania has received loans from the African Development Bank (AfDB) towards the cost of undertaking their Transport Sector Support Programme (TSSP) and intends to use part of the funds to carry out Consultancy Services for Feasibility Study, Environmental & Social Impact Assessment, Detailed Engineering Design and Preparation of Tender Documents for Construction of a Bridge and Its Approach Roads to Bypass Mtera Dam and the Babati Town Bypass Road (15.5 Km). The scope of services included under this project comprises two phases: Phase I: Feasibility Study including the Preliminary Design, Cost Estimates, Preliminary Environmental & Social Impacts and development of Preliminary Resettlement Action Plan and Survey of Properties to be affected. Phase II: Detailed Engineering Design, including Detailed Environmental and Social Impact Assessment, Development of Resettlement Action Plan and Preparation of Bidding Documents. The duration of the assignment is 14 months after commencement of the services. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
