logo
ProjectClosed

Continental Headquarters / HENN

Sector: Road • Location: Germany

Source: ArchDaily

The complex is embedded in a generously designed, publicly accessible landscaped area that lets the trees of the surrounding landscape permeate the campus. The individual buildings enclose more secluded, planted courtyards providing outdoor workplaces as well as room for recreation.This project makes Continental benefit from a campus-like development formed by interlinked free-standing buildings e

Status
Closed
Sector
Road, Power Generation (CCGT), Solar, Automotive, Bridge, Residential, Commercial
Location
Germany
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Continental Headquarters / HENN

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Continental Headquarters / HENN” is an infrastructure initiative in the Road sector, located in Germany. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The complex is embedded in a generously designed, publicly accessible landscaped area that lets the trees of the surrounding landscape permeate the campus. The individual buildings enclose more secluded, planted courtyards providing outdoor workplaces as well as room for recreation.This project makes Continental benefit from a campus-like development formed by interlinked free-standing buildings embedded in an urban environment, including office and administrative buildings, hotels, and industry. It is located on two plots of land separated by an eight-lane road. The layout derives its core design idea from this location: a complex with a ground plan inspired by motor racing circuits. It connects buildings north and south of the road via a bridge spanning more than 70 meters.The basic design concept thus remains clearly visible both in the interiors and outside the buildings. On the smooth glass façade articulated by dark grey profiles, color-printed glass panels mark the Loop on all sides and visually connect all buildings to form a coherent whole. Thanks to their energy-efficient inverted façade, the buildings do not require external solar shading.On the second floor, the Loop runs through all buildings and across the bridge as a dynamic spatial continuum that interconnects all buildings and employees. It functions as the communication center of the new headquarters, providing a wide array of spaces including collaborative work zones as well as room for knowledge sharing and informal encounters. In addition to areas for focused work, this design creates spaces for social interaction where people can meet and come together.The Loop establishes a horizontal network of office and meeting rooms, a cafeteria, and a health center. On its northern and southern ends, it connects to the first-floor level via two ’touchdowns.’ This is where the two atria are situated, which welcome employees and visitors to the building while also providing direct links to the company canteen and a TV recording studio. The interiors of the work environments and staff canteen were designed by Ippolito Fleitz Group.Text description provided by the architects.On the eastern outskirts ofHanover, the new headquarters of Continental AG designed by HENN consolidates several functions previously spread across the city in a single location. Its dynamic design reflects the company’s evolution from a pure tire manufacturer to an innovative technology group in the German automotive industry.The new Continental headquarters embodies the power of communication and cooperation, bringing people together under a single roof to shape the future of mobility.

Location

Country

Germany

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Solar, Automotive, Bridge, Residential, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project