logo

Continuation of Support for SEFB and Development of New Technologies: SG & RE

Sector: Power Generation (CCGT) • Location: Barbados

Source: Inter-American Development Bank (IADB)

Project
Closed

The objective of this TC is to provide continued support for the Sustainable Energy Framework for Barbados (SEFB), and for the development of new technologies, such as Smart Grids and other sustainable energy technologies that can further contribute to achieving SEFB goals. Namely, promoting RE, both at utility-scale and distributed generation, and EE in order to reduce Barbados¿ fossil fuel depen

Project Information FAQ

Project Information

5 Q
The project “Continuation of Support for SEFB and Development of New Technologies: SG & RE” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Barbados. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of this TC is to provide continued support for the Sustainable Energy Framework for Barbados (SEFB), and for the development of new technologies, such as Smart Grids and other sustainable energy technologies that can further contribute to achieving SEFB goals. Namely, promoting RE, both at utility-scale and distributed generation, and EE in order to reduce Barbados¿ fossil fuel dependency. The specific objectives are: to (i) support further implementation of sustainable energy policy legislation; (ii) prepare technical studies that will contribute to the promotion of RE, EE, and EC and serve as input for the preparation of specific Bank operations in Barbados; (iii) implement the impact evaluation of the SEFB Program; (iv) design financial instruments to promote large scale deployment of RE and EE projects; and (v) study and design a Smart Grid deployment project with RE resources and grid energy storage, while analyzing its financial cost and benefit.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data