Control Building - Aqueduct and Supply Design
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
Construction of a control building and 100 m of pipes to allow the use of a well in two distinct distribution areas and design of a watermain connecting the Tilley Road supply to the Rivière-à -trout.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Control Building - Aqueduct and Supply Design
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a control building and 100 m of pipes to allow the use of a well in two distinct distribution areas and design of a watermain connecting the Tilley Road supply to the Rivière-à -trout. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
