Control System Upgrades - 2025
Sector: Water Supply and Storage • Location: Hermiston, Oregon, United States of America
Source: Dodge
The Work includes, but is not limited to, the installation of a new flowmeter, an active harmonic filter, new power distribution equipment, three variable frequency drives with output filters, an Owner-furnished control panel, new lighting, and other various electrical, mechanical, and controls upgrades.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road
- Location
- Hermiston, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Control System Upgrades - 2025
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes, but is not limited to, the installation of a new flowmeter, an active harmonic filter, new power distribution equipment, three variable frequency drives with output filters, an Owner-furnished control panel, new lighting, and other various electrical, mechanical, and controls upgrades. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Hermiston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
