Controlled Temperature Storage
Bid results · California · Last reported Feb 2025
Source: Dodge
Install a new, temperature-controlled storage room inside existing warehouse, complete with insulation, lighting, HVAC, and fire protection.
- Status
- Closed
- Sector
- Consumer Products, Raw Materials, Warehouse, Commercial
- Location
- Tracy, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Controlled Temperature Storage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install a new, temperature-controlled storage room inside existing warehouse, complete with insulation, lighting, HVAC, and fire protection. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Tracy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Raw Materials, Warehouse, Commercial |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
