Conversion and Mainline Circuit Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The general nature of the work on which bids will be received consists of converting the remaining 2.4kV primary circuitry to 12.47 kV primary electric underground circuity and construction of new 12.47kV mainline tie circuitry. The project includes the installation of Owner-furnished material and equipment including boxpads, sectionalizing cabinets, 15 kV primary cable, and 600V secondary cable i
- Status
- Closed
- Sector
- Power Generation (CCGT), Telecommunications, Power Transmission, Government, Road, Commercial
- Location
- Remsen, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Conversion and Mainline Circuit Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The general nature of the work on which bids will be received consists of converting the remaining 2.4kV primary circuitry to 12.47 kV primary electric underground circuity and construction of new 12.47kV mainline tie circuitry. The project includes the installation of Owner-furnished material and equipment including boxpads, sectionalizing cabinets, 15 kV primary cable, and 600V secondary cable in Contractor-furnished and installed conduit in trench, bore, or other excavations. The Owner wil... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Remsen |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Telecommunications, Power Transmission, Government, Road, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
