logo
ProjectClosed

Convert Bridges to Culverts

Closed · Saskatchewan · Last reported Aug 2025

Source: Dodge

The Rural Municipality of Excelsior No. 166 (hereinafter referred to as the RM ) is currently in the process of converting bridges/box culverts to steel culverts at the NW/NE16-16-12W3M (two culverts with approximate size of 8 by 72 ); SE 23/SW24-16-12W3M (two culverts with approximate size of 8 x 72 ); and SE3-17-11W3M (three culverts with approximate size of 8 x 60 ). This Request for Proposal (

Status
Closed
Sector
Water Supply and Storage, Steel, Government, Road, Bridge, Waste Processing and Treatment, Commercial, Metal
Location
Rush Lake, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Convert Bridges to Culverts

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Convert Bridges to Culverts” is an infrastructure initiative in the Water Supply and Storage sector, located in Rush Lake, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Rural Municipality of Excelsior No. 166 (hereinafter referred to as the RM ) is currently in the process of converting bridges/box culverts to steel culverts at the NW/NE16-16-12W3M (two culverts with approximate size of 8 by 72 ); SE 23/SW24-16-12W3M (two culverts with approximate size of 8 x 72 ); and SE3-17-11W3M (three culverts with approximate size of 8 x 60 ). This Request for Proposal (RFP) is an invitation by the RM to prospective proponents to submit proposals for the provision o...

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Rush Lake

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Government, Road, Bridge, Waste Processing and Treatment, Commercial, Metal

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project