logo

Cooke Road Culvert Improvements

Sector: Water Supply and Storage • Location: Columbus, Ohio, United States of America

Source: Dodge USA

Project
Construction Documents

This project will obtain easements and allow the city to repair an existing 21" corrugated metal storm sewer south of Cooke Rd. at Eastlea Dr. Ditch improvements to improve the capture of Cooke Rd. storm water runoff at the upstream end of the sewer are also being investigated. The project is also planning to obtain easements to allow repair of a collapsed 6" clay storm sewer along the west proper

Status
Closed
Sector
Water Supply and Storage, Government, Metal, Commercial, Road, Waste Processing and Treatment
Location
Columbus, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Cooke Road Culvert Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cooke Road Culvert Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Columbus, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will obtain easements and allow the city to repair an existing 21" corrugated metal storm sewer south of Cooke Rd. at Eastlea Dr. Ditch improvements to improve the capture of Cooke Rd. storm water runoff at the upstream end of the sewer are also being investigated. The project is also planning to obtain easements to allow repair of a collapsed 6" clay storm sewer along the west property line of 503 E. Cooke Rd.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Columbus

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Metal, Commercial, Road, Waste Processing and Treatment

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project