Cooklands 50 MW/100 MWh Battery Energy Storage System (BESS) Project
Sector: Power Generation (CCGT) • Location: Pontefract, England, United Kingdom
Source: ESS News
The Cooklands BESS project is a 50 MW/100 MWh battery energy storage system near Pontefract, England. The project faced initial planning permission rejection by Wakefield Metropolitan District Council due to concerns about green belt land classification but was later approved on appeal by the UK Planning Inspectorate, which classified the site as gray-belt land. The project requires submission of
- Status
- Prospective
- Sector
- Power Generation (CCGT), Energy Storage
- Location
- Pontefract, England, United Kingdom
- Updated
- 22 Jul 2026
- Source
- ESS News
ConstructChat
Ask ConstructChat about Cooklands 50 MW/100 MWh Battery Energy Storage System (BESS) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Cooklands BESS project is a 50 MW/100 MWh battery energy storage system near Pontefract, England. The project faced initial planning permission rejection by Wakefield Metropolitan District Council due to concerns about green belt land classification but was later approved on appeal by the UK Planning Inspectorate, which classified the site as gray-belt land. The project requires submission of environmental and safety plans before construction begins. |
Original sector | Energy Storage |
Location
Country | United Kingdom (UK) |
State | England |
City | Pontefract |
Source
Source | ESS News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage |
Article published date | 2025-12-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
