Cool Valley Mixed Use Development Infrastructure
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Phase One construction activities, including excavating and grading of up to 250 acres of land, as well as the installation of basic infrastructure encompassing water, gas and electricity lines and road placement. Once completed, the first phase of the project will result in about 250 acres of pad-ready sites.
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial
- Location
- Cecil Township, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cool Valley Mixed Use Development Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Phase One construction activities, including excavating and grading of up to 250 acres of land, as well as the installation of basic infrastructure encompassing water, gas and electricity lines and road placement. Once completed, the first phase of the project will result in about 250 acres of pad-ready sites. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Cecil Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
