Cooley School Redevelopment Phase II
Planning schematics · Michigan · Last reported Aug 2025
Source: Dodge
The second phase would include the development of housing on the south half of the property. The current plan is to create small, individual homes to be sold as part of a site condo, utilizing shared common spaces. The belief is the site could fit 10 small homes.
- Status
- Prospective
- Sector
- Power Transmission, Residential, Commercial, Power Generation (CCGT), Education
- Location
- Cadillac, Michigan, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cooley School Redevelopment Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The second phase would include the development of housing on the south half of the property. The current plan is to create small, individual homes to be sold as part of a site condo, utilizing shared common spaces. The belief is the site could fit 10 small homes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Cadillac |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Residential, Commercial, Power Generation (CCGT), Education |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
