Coolidge Generating Station Natural Gas Expansion (CEP)
Sector: Power Generation (CCGT) • Location: Coolidge, Arizona, United States of America
Source: Dodge USA
Modified plan: added 575 megawatts (MW) of capacity produced by 12 natural gas turbines, doubling capacity, enough energy to power more than 139,000 homes. located on 100 acres to south of existing facility. 2,025 MW of solar and wind and 1,100 MW of battery storage to also be added. Project to use General Electric LM6000 turbine technology. The project generation units will now be located 400 ft
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Energy Storage, Residential, Commercial, Natural Gas, Solar, Wind
- Location
- Coolidge, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Coolidge Generating Station Natural Gas Expansion (CEP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Modified plan: added 575 megawatts (MW) of capacity produced by 12 natural gas turbines, doubling capacity, enough energy to power more than 139,000 homes. located on 100 acres to south of existing facility. 2,025 MW of solar and wind and 1,100 MW of battery storage to also be added. Project to use General Electric LM6000 turbine technology. The project generation units will now be located 400 ft further away from the community of Randolph and operational use of the units will be limited to 3... |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Coolidge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage, Residential, Commercial, Natural Gas, Solar, Wind |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
