Cooper SSDE Dock & Pier
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
Remove existing solid surfaced pier, ramp and float supported by 37 creosote piling. Replace with fully grated aluminum pier, fully grated ramp and new float with 50% functional grating (60% open area) The new pier will be supported with eight 8" galvanized steel piling and the float will be supported with five 10" galvanized steel piling
- Status
- Prospective
- Sector
- Commercial, Metal, Steel, Manufacturing (Industrial)
- Location
- Bainbridge Island, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cooper SSDE Dock & Pier
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove existing solid surfaced pier, ramp and float supported by 37 creosote piling. Replace with fully grated aluminum pier, fully grated ramp and new float with 50% functional grating (60% open area) The new pier will be supported with eight 8" galvanized steel piling and the float will be supported with five 10" galvanized steel piling |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bainbridge Island |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Steel, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
