Cooperative Ecosystem Studies Unit, Great Plains CESU
Sector: Hydro • Location: United States of America
Source: Grants.gov
The U.S. Geological Survey (USGS) Northern Prairie Wildlife Research Center (NPWRC) is offering a funding opportunity to a CESU partner for research exploring restoration of a fen at the U.S. Fish and Wildlife Serviceâ¿¿s (FWS) Chase Lake Prairie Project near Woodworth, North Dakota. Fens are rare wetland habitat types within the Prairie Pothole Region (PPR) of North America. As such, they suppor
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage, Government, Education, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Cooperative Ecosystem Studies Unit, Great Plains CESU
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The U.S. Geological Survey (USGS) Northern Prairie Wildlife Research Center (NPWRC) is offering a funding opportunity to a CESU partner for research exploring restoration of a fen at the U.S. Fish and Wildlife Serviceâ¿¿s (FWS) Chase Lake Prairie Project near Woodworth, North Dakota. Fens are rare wetland habitat types within the Prairie Pothole Region (PPR) of North America. As such, they support many rare plant, invertebrate and wildlife species. Given the extent of land-use and land-cover change throughout the PPR, many of the regionâ¿¿s fens have been lost or degraded. One such fen occurs on FWS owned land near Woodworth, ND. The fen was highly degraded when a dam was installed on its down gradient side to pond water in an effort to enhance waterfowl habitat. The small lake formed behind the dam effectively destroyed the fen through perennial flooding. In the spring of 2017, the water-control structure in the dam washed out and FWS, rather than rebuilding the structure, is planning to remove the dam and restore the fen habitat. This presents a unique opportunity to study the recovery of a PPR fen through the entire restoration process. |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Government, Education, Manufacturing (Industrial) |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- I-90 Keechelus Dam to Stampede Pass Phase 2A
- I-90 Snowshed to Keechelus Dam Phase 1C
- BUSH FIELD - LOCK AND DAM ROAD
- SR 9 FM S OF BUFORD DAM RD TO PIRKLE FERRY RD
- Contract to revamp Anderson's Dam together with the Valley Water District, near two fault lines in Santa Clara County, California (United States)
- Intake works, construction of wells and conduction of the hydraulic circuit in the Chira and Soria dams, in Gran Canaria (Spain)
- CR 742/BASS ROAD FROM PROVIDENCE BLVD TO NEW FORSYTH ROAD
