COPEL II DIST

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

The project is part of COPEL's program for the expansion of its power subtransmission and distribution system during the period from January 1, 1980 to June 30, 1981. COPEL's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in COPEL's service area (the state of Parana), mostly related to industrial growth. The program will also ma

Status
Closed
Sector
Power Generation (CCGT), Manufacturing (Industrial), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about COPEL II DIST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “COPEL II DIST” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is part of COPEL's program for the expansion of its power subtransmission and distribution system during the period from January 1, 1980 to June 30, 1981. COPEL's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in COPEL's service area (the state of Parana), mostly related to industrial growth. The program will also make public service electricity available to about 45,000 new low-income urban consumers and in connecting about 50,000 new rural consumers. The project includes the following: (i) construction of about 810 circuit-kilometers of subtransmission lines at 230 KV, 138 KV and 69 KV and installation of about 2,120 MVA of additional transformer capacity; (ii) construction of about 2,250 circuit-kilometers of distribution lines at 34.5 KV and lower voltages, and about 590 circuit-kilometers of feeders, and installation of about 410 MVA of additional transformer capacity, for the connection of about 415,000 new consumers; (iii) modernization and enlargement of laboratories and acquisition of maintenance and operation equipment; and about 245 man-months of consultants' services for preparation of bidding documents and equipment fabrication inspections.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Manufacturing (Industrial), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project