COPEL II DIST

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Closed

The project is part of COPEL's program for the expansion of its power subtransmission and distribution system during the period from January 1, 1980 to June 30, 1981. COPEL's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in COPEL's service area (the state of Parana), mostly related to industrial growth. The program will also ma

Project Information FAQ

Project Information

5 Q
The project “COPEL II DIST” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is part of COPEL's program for the expansion of its power subtransmission and distribution system during the period from January 1, 1980 to June 30, 1981. COPEL's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in COPEL's service area (the state of Parana), mostly related to industrial growth. The program will also make public service electricity available to about 45,000 new low-income urban consumers and in connecting about 50,000 new rural consumers. The project includes the following: (i) construction of about 810 circuit-kilometers of subtransmission lines at 230 KV, 138 KV and 69 KV and installation of about 2,120 MVA of additional transformer capacity; (ii) construction of about 2,250 circuit-kilometers of distribution lines at 34.5 KV and lower voltages, and about 590 circuit-kilometers of feeders, and installation of about 410 MVA of additional transformer capacity, for the connection of about 415,000 new consumers; (iii) modernization and enlargement of laboratories and acquisition of maintenance and operation equipment; and about 245 man-months of consultants' services for preparation of bidding documents and equipment fabrication inspections.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data