logo

COPEL POWER DISTRIBU

Sector: Road • Location: Brazil

Source: World Bank Group

Project
Closed

The project includes investments in subtransmission and distribution needed to meet increased demands on the utility's system; related inspection and training and acquisition of laboratory maintenance and system operation equipment as follows: (i) installation of 50 circuit-km of 138 kV tie lines; (ii) construction, expansion or improvements of nine 138 kV substations, including addition of 305 MV

Project Information FAQ

Project Information

5 Q
The project “COPEL POWER DISTRIBU” is an infrastructure initiative in the Road sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes investments in subtransmission and distribution needed to meet increased demands on the utility's system; related inspection and training and acquisition of laboratory maintenance and system operation equipment as follows: (i) installation of 50 circuit-km of 138 kV tie lines; (ii) construction, expansion or improvements of nine 138 kV substations, including addition of 305 MVA transformer capacity; (iii) installation of 390 MVA transformer capacity at 69 kV and 80 MVA transformer capacity at 34.5 kV; (iv) installation of 166 circuit-km of 69 kV lines, 130 km of 13.8 kV feeders, 1,040 km of 34.5 kV lines and 860 km of 13.8 kV lines, 4,560 transformers and 200 transformers with an aggregate capacity of 260 MVA; 3,100 circuits of 34.5 kV and 13.8 kV; 145,000 electric meters; 135,000 street lights; (v) improvement of 1630 existing circuits of 34.5 kV and 13.8 kV; (vi) replacement of 85,000 electric meters; (vii) expansion of meter laboratory facilities and equipment; (viii) supplementary equipment for maintenance and operation including energized-line maintenance and system protection and operation equipment; and (ix) inspection of equipment fabrication, through the utilization of consultants' services, and training of staff during such inspection.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data