logo
ProjectClosed

COPEL POWER DISTRIBU

Closed · Brazil

Source: World Bank Group

The project includes investments in subtransmission and distribution needed to meet increased demands on the utility's system; related inspection and training and acquisition of laboratory maintenance and system operation equipment as follows: (i) installation of 50 circuit-km of 138 kV tie lines; (ii) construction, expansion or improvements of nine 138 kV substations, including addition of 305 MV

Status
Closed
Sector
Road, Power Generation (CCGT), Manufacturing (Industrial), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about COPEL POWER DISTRIBU

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “COPEL POWER DISTRIBU” is an infrastructure initiative in the Road sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes investments in subtransmission and distribution needed to meet increased demands on the utility's system; related inspection and training and acquisition of laboratory maintenance and system operation equipment as follows: (i) installation of 50 circuit-km of 138 kV tie lines; (ii) construction, expansion or improvements of nine 138 kV substations, including addition of 305 MVA transformer capacity; (iii) installation of 390 MVA transformer capacity at 69 kV and 80 MVA transformer capacity at 34.5 kV; (iv) installation of 166 circuit-km of 69 kV lines, 130 km of 13.8 kV feeders, 1,040 km of 34.5 kV lines and 860 km of 13.8 kV lines, 4,560 transformers and 200 transformers with an aggregate capacity of 260 MVA; 3,100 circuits of 34.5 kV and 13.8 kV; 145,000 electric meters; 135,000 street lights; (v) improvement of 1630 existing circuits of 34.5 kV and 13.8 kV; (vi) replacement of 85,000 electric meters; (vii) expansion of meter laboratory facilities and equipment; (viii) supplementary equipment for maintenance and operation including energized-line maintenance and system protection and operation equipment; and (ix) inspection of equipment fabrication, through the utilization of consultants' services, and training of staff during such inspection.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Manufacturing (Industrial), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project