logo
ProjectClosed

Copley-Fairlawn Stadium Redevelopment

Sector: Commercial • Location: Akron, Ohio, United States of America

Source: Dodge USA

The project site is located at the existing Football Stadium within Copley-Fairlawn High School Campus at 3797 Ridgewood Road, Copley, Summit County, Ohio. Based on the provided Soil Boring Locations plan, the proposed renovation includes demolition and/or addition to existing structures such as grandstands, concessions, locker, and restrooms. A 1600 square foot (sf) maintenance building is propos

Status
Closed
Sector
Commercial, Car parking, Stadium, Road, Automotive, Government, Manufacturing (Industrial)
Location
Akron, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Copley-Fairlawn Stadium Redevelopment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Copley-Fairlawn Stadium Redevelopment” is an infrastructure initiative in the Commercial sector, located in Akron, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project site is located at the existing Football Stadium within Copley-Fairlawn High School Campus at 3797 Ridgewood Road, Copley, Summit County, Ohio. Based on the provided Soil Boring Locations plan, the proposed renovation includes demolition and/or addition to existing structures such as grandstands, concessions, locker, and restrooms. A 1600 square foot (sf) maintenance building is proposed to the southeast side of the existing football field, and a bus turn around auxiliary parking ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Akron

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Car parking, Stadium, Road, Automotive, Government, Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project