logo

Copperstone Gold Project Underground Mine and Processing Plant

Sector: Power Generation (CCGT) • Location: Quartzsite, Arizona, United States

Source: TradingView

Project
Planned

The Copperstone Gold Project is a 100%-owned, past-producing underground gold mining project located in La Paz County, Arizona, USA. The project involves underground mining using an overhand mechanized cut-and-fill approach with cemented rock fill, and a processing plant designed to produce gold concentrate and gold-loaded carbon products. The project includes existing infrastructure such as power

Status
Prospective
Sector
Power Generation (CCGT), Water Supply and Storage, Road
Location
Quartzsite, Arizona, United States of America
Updated
22 Jul 2026
Source
TradingView

ConstructChat

Ask ConstructChat about Copperstone Gold Project Underground Mine and Processing Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Copperstone Gold Project Underground Mine and Processing Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Quartzsite, Arizona, United States. Taiyo aggregates data on it from TradingView.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Copperstone Gold Project is a 100%-owned, past-producing underground gold mining project located in La Paz County, Arizona, USA. The project involves underground mining using an overhand mechanized cut-and-fill approach with cemented rock fill, and a processing plant designed to produce gold concentrate and gold-loaded carbon products. The project includes existing infrastructure such as power distribution, buildings, roads, tailings storage facility, and water rights. The project has a planned initial mine life of 6.3 years with an average annual production of 46 koz gold, and initial production is anticipated by mid-2027 following approximately one year of construction.

Original sector

Mining

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Quartzsite

Source

Source

TradingView

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Road

Article published date

2026-05-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project