COPT Potranco Romp03 and 04 Data Center
Sector: Manufacturing (Industrial) • Location: San Antonio, Texas, United States of America
Source: Dodge USA
Interior fit-out of an existing data center building. Work includes construction of interior partitions, ceilings, finishes, mechanical, electrical, plumbing, and fire protection systems for the new data hall and its mechanical and electrical spaces. Square Footage: 33,411
- Status
- Closed
- Sector
- Manufacturing (Industrial), Data Center, Commercial, Power Generation (CCGT)
- Location
- San Antonio, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about COPT Potranco Romp03 and 04 Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior fit-out of an existing data center building. Work includes construction of interior partitions, ceilings, finishes, mechanical, electrical, plumbing, and fire protection systems for the new data hall and its mechanical and electrical spaces. Square Footage: 33,411 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Antonio |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Data Center, Commercial, Power Generation (CCGT) |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
