logo

Cosan Ipaussu Biomass Plant

Sector: Biomass • Location: Brazil

Source: World Bank Group

Project
Active

The company Barra Bioenergia, a wholly-owned subsidiary of the Brazilian group Cosan, was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (76 MW in total capacity). The power plant was known as UTE Ipaussu Bioenergia.

The 35-year contract was signed with the regulatory agency ANEEL in December 2009 for a 62-MW power plant. I

Status
Prospective
Sector
Biomass, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cosan Ipaussu Biomass Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cosan Ipaussu Biomass Plant” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The company Barra Bioenergia, a wholly-owned subsidiary of the Brazilian group Cosan, was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (76 MW in total capacity). The power plant was known as UTE Ipaussu Bioenergia. The 35-year contract was signed with the regulatory agency ANEEL in December 2009 for a 62-MW power plant. In February 2011, ANEEL authorized the expansion of the capacity to 76 MW. The value of the investment committed to the project was estimated at US$ 56.1 million (BRL 91.5 million). In September 2011, the Brazilian state-owned development bank BNDES approved a US$ 22.8 million (BRL 37.2 million) loan to finance the project. The electricity produced was set to be sold under 15-year power purchase agreements signed with electricity distribution companies. Barra Bioenergia was able to arrange these contracts by taking part in a competitive bidding process that occurred in August 2008. Additionally, any energy surplus not sold was set to be negotiated in the free market with purchasers not yet established. Operations commenced in November 2012.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project