logo

Costanera Sur Avenue PPP project in Asunción

Sector: Water Supply and Storage • Location: Paraguay

Source: InfraPPPWorld

Project
Project In Construction

The project involves the construction of a 7.6 km long highway connecting Lambaré Hill to Avda Colón in Asunción, Paraguay.The scope of works includes the construction of a service lane that will be part of the urbanization of an area of ​​66 ha that will be conditioned at a non-flood level by the method of refining, benefiting more than 2,500 families residing in the area with decent social housi

Project Information FAQ

Project Information

5 Q
The project “Costanera Sur Avenue PPP project in Asunción” is an infrastructure initiative in the Water Supply and Storage sector, located in Paraguay. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the construction of a 7.6 km long highway connecting Lambaré Hill to Avda Colón in Asunción, Paraguay.The scope of works includes the construction of a service lane that will be part of the urbanization of an area of ​​66 ha that will be conditioned at a non-flood level by the method of refining, benefiting more than 2,500 families residing in the area with decent social housing. The road will have a Linear Park of 1000 m, urban equipment, and basic services for the convenience of citizens. The project will include the installation of garbage dumps, banks, bicycle parking, toilets, emergency posts and landscaping that incorporates native species. The main avenue will have 4 lanes (two lanes per side), divided by a 15-m wide central promenade. The road will have a storm drain system, public lighting and installation of running water, as well as underground pipelines for the installation of weak signals. To this are added parking lots, inclusive accesses, vertical, horizontal and porch signaling signs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data