Costco Depot Cold Side Expansion
Sector: Power Transmission • Location: Belleville, Michigan, United States of America
Source: Dodge USA
SCOPE OF WORK: Site 1.3 acres, Depot Addition Cold Side Only = 54,000 SF, and Offices = 2,700 SF -including, but not limited to: On-Site - Survey, Erosion Control & SWPPs, Select Site Demolition, Earthwork, Wet Utilities, Asphalt Pavement Patching, Pavement Markings, Site Concrete, Select Building Demolition & Temporary Protection, CIP Building Concrete, Precast Concrete Wall Panels; Penetrating S
- Status
- Closed
- Sector
- Power Transmission, Cement, Warehouse, Road, Metal, Residential, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Belleville, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Costco Depot Cold Side Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK: Site 1.3 acres, Depot Addition Cold Side Only = 54,000 SF, and Offices = 2,700 SF -including, but not limited to: On-Site - Survey, Erosion Control & SWPPs, Select Site Demolition, Earthwork, Wet Utilities, Asphalt Pavement Patching, Pavement Markings, Site Concrete, Select Building Demolition & Temporary Protection, CIP Building Concrete, Precast Concrete Wall Panels; Penetrating Sealer/Hardener, Joint Filler, Masonry, Cold-Formed Metal Framing, Misc. Metals, Misc. Carpentry, ... |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Belleville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Warehouse, Road, Metal, Residential, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
