logo

Cote d’Ivoire - Abidjan Urban Transport Project

Sector: Waste Processing and Treatment • Location: Côte d'Ivoire

Source: African Development Bank (AfDB)

Project

The Abidjan urban transport project was designed to improve the living conditions of the city’s inhabitants. Indeed, it was initiated because due to the combined effect of population growth, the rapid increase in the number of motor vehicles and the decline of public transport systems, the road network and traffic control system have proved to be inadequate to ensure the flow of the increasing vol

Project Information FAQ

Project Information

4 Q
The project “Cote d’Ivoire - Abidjan Urban Transport Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Côte d'Ivoire. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Abidjan urban transport project was designed to improve the living conditions of the city’s inhabitants. Indeed, it was initiated because due to the combined effect of population growth, the rapid increase in the number of motor vehicles and the decline of public transport systems, the road network and traffic control system have proved to be inadequate to ensure the flow of the increasing volume of traffic. The project concerns the construction of 87.9 kilometres of urban expressways, a 1 400-metre long bridge and 6 interchanges, the rehabilitation of traffic lights at 89 intersections, air quality assessment, urban waste management as well as the strengthening of existing capacity in traffic control, urban planning, domestic revenue mobilization, road safety, and natural ecosystem protection. The project, which will be implemented from March 2017 to December 2021, will help to improve traffic flow, reduce road accidents, strengthen urban management, improve air quality, increase household incomes, reclaim waste, reduce greenhouse gases, and improve the quality of life of the population. The total cost of the project is estimated at UA 610.94 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data