Cote d'Ivoire - Atinkou (CIPREL V) 390 MW Gas Power Project

Sector: Power Generation (CCGT) • Location: Côte d'Ivoire

Source: African Development Bank (AfDB)

Project

The Atinkou 390 MW gas power project has been selected by the GoCI as a priority project to meet baseload requirement of Côte d’Ivoire and strengthen its status as first energy exporter in the region due to its combined cycle technology which provides with unique efficiency levels. It complements the Bank's efforts to improve power generation, trade and transmission in the sub-region through the C

Project Information FAQ

Project Information

4 Q
The project “Cote d'Ivoire - Atinkou (CIPREL V) 390 MW Gas Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Côte d'Ivoire. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Atinkou 390 MW gas power project has been selected by the GoCI as a priority project to meet baseload requirement of Côte d’Ivoire and strengthen its status as first energy exporter in the region due to its combined cycle technology which provides with unique efficiency levels. It complements the Bank's efforts to improve power generation, trade and transmission in the sub-region through the Côte d'Ivoire - Liberia - Sierra Leone - Guinea (CSLG) power interconnection project. The project, together with Azito IV, is primarily designed with the aim to replace the inefficient emergency plant of Aggreko (200 MW), Vridi plant (100 MW) and Ciprel I (99 MW).The project will also provide the necessary baseload backbone for the implementation of planned intermittent solar and hydro projects. In order to strengthen the Ivorian electricity network, the Atinkou power plant, built on a 30-hectare site, will have a capacity of 390 megawatts (MW). The project, to be carried out in two phases, calls for the construction of a 255 MW gas turbine within 18 months and the completion of the combined cycle, consisting of a 135 MW steam turbine and a heat recovery boiler, within 9 months. Eventually, the Taboth power plant will supply more than 2,800 gigawatts/hour of energy per year to the Ivorian power grid.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data