The objectives of the Electricity Transmission and Access Project are to contribute to the improvement of the efficiency and reliability of electricity supply and increased access to electricity in Cote d’Ivoire. There are four components to the project, the first component being reinforcement of transmission systems. The GTMP identified overloaded transmission lines and transformers in selected s

Project Information FAQ

Project Information

5 Q
The project “Cote d'Ivoire - Electricity Transmission and Access Project” is an infrastructure initiative in the Power Transmission sector, located in Cote d'Ivoire. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Electricity Transmission and Access Project are to contribute to the improvement of the efficiency and reliability of electricity supply and increased access to electricity in Cote d’Ivoire. There are four components to the project, the first component being reinforcement of transmission systems. The GTMP identified overloaded transmission lines and transformers in selected substations that reduce the ability of the grid to meet the (n-1) reliability criterion and cause a deterioration of quality of electricity supply and high energy loss levels. The main rationale for this component is to improve the quality and reliability of power supply and to ensure that the transmission system will be able to absorb the new generation capacity that is planned. The second component is the rehabilitation, reinforcement, and extension of distribution systems in Abidjan and selected regional capital cities. The third component is the rural electrification and support to electricity for all program. This component will finance the electrification of 201 localities in rural areas and provide support for the GoCDI’s E4All program. Finally, the fourth component is the strengthening institutional capacity of the electricity sector and project management (US$13.4 million equivalent). This component will support capacity building and project management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data