Cote d'Ivoire - Electricity Transmission and Access Project
Sector: Power Transmission • Location: Cote d'Ivoire
Source: World Bank Group
The objectives of the Electricity Transmission and Access Project are to contribute to the improvement of the efficiency and reliability of electricity supply and increased access to electricity in Cote d’Ivoire. There are four components to the project, the first component being reinforcement of transmission systems. The GTMP identified overloaded transmission lines and transformers in selected s
- Status
- Closed
- Sector
- Power Transmission, Forest Products and Packaging, Commercial, Power Generation (CCGT), Government
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cote d'Ivoire - Electricity Transmission and Access Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Electricity Transmission and Access Project are to contribute to the improvement of the efficiency and reliability of electricity supply and increased access to electricity in Cote d’Ivoire. There are four components to the project, the first component being reinforcement of transmission systems. The GTMP identified overloaded transmission lines and transformers in selected substations that reduce the ability of the grid to meet the (n-1) reliability criterion and cause a deterioration of quality of electricity supply and high energy loss levels. The main rationale for this component is to improve the quality and reliability of power supply and to ensure that the transmission system will be able to absorb the new generation capacity that is planned. The second component is the rehabilitation, reinforcement, and extension of distribution systems in Abidjan and selected regional capital cities. The third component is the rural electrification and support to electricity for all program. This component will finance the electrification of 201 localities in rural areas and provide support for the GoCDI’s E4All program. Finally, the fourth component is the strengthening institutional capacity of the electricity sector and project management (US$13.4 million equivalent). This component will support capacity building and project management. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Forest Products and Packaging, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Cote d'Ivoire
- 330 kV Côte d’Ivoire - Ghana Interconnection Reinforcement Project
- 225 kV Côte dIvoire - Liberia - S.Leone - Guinea Interconnection Project
- Côte d'ivoire – Burkina Interconnection Reinforcement Project
- Cross Border Supply of Electricity to Rural Communities in Liberia from Côte d'Ivoire
- COTE D'IVOIRE - Emergency Basic Education Support Project - GPEF Grant
- Education & Training Support
- Urgent Electricity Rehabilitation Project
- WAPP - Ghana - Côte d'Ivoire transmission line, (Côte d'Ivoire section)
