Cote d’Ivoire Inclusive Connectivity and Rural Infrastructure Project
One of 425 projects Taiyo tracks in Cote d'Ivoire.
Source: World Bank Group
The project will be co-financed by World Bank and Asian Infrastructure Investment Bank (AIIB). It will be a joint co-financing, with AIIB contributing to components 1, 2.1 and 3 (about 48 percent for AIIB and 52 percent World Bank). The project is structured around six components:- Component 1: Inclusive and Resilient Rural Connectivity Infrastructure [rehabilitation/maintenance of unpaved roads a
- Status
- Prospective
- Sector
- Mass Transit, Road, Solar, Water Supply and Storage, Rail, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government, Commercial
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cote d’Ivoire Inclusive Connectivity and Rural Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will be co-financed by World Bank and Asian Infrastructure Investment Bank (AIIB). It will be a joint co-financing, with AIIB contributing to components 1, 2.1 and 3 (about 48 percent for AIIB and 52 percent World Bank). The project is structured around six components:- Component 1: Inclusive and Resilient Rural Connectivity Infrastructure [rehabilitation/maintenance of unpaved roads and rivers crossings, construction (including widening the right of way and few changes in alignment) of a paved road, small storm-water basins and catchments to capture runoff water]- Component 2. Rural socio-economic infrastructure [markets: construction of sheds and small storage and processing facilities, internal pathways, water and sanitation facilities, drainage infrastructure; pastoral connectivity: rehabilitation of transhumance corridors, including livestock channeling hedges, fodder plots, temporary night parks, temporary shelters for shepherds, as well as water points; schools and health centers: construction/rehabilitation of water/handwashing points and toilets, fences, energy connection (solar for off-grid areas), amenities: construction and rehabilitation of recreation spaces, spot lighting etc.; water/energy: small water pipe and electricity extensions; climate change: tree planting in or around the villages]- Component 3: Capacity building, support to Institutional framework and sector strategy [capacity building for public entities and private actors to implement components 1, 2 & 3; TA for the finalization of the rural roads' strategy and road maintenance strategy; road safety and other technical assistance to project implementation]- Component 4: Support to Project Management [Citizen Engagement, M&E, audits, Third-Party Monitoring and contribution to operational costs]- Component 5: Contingent Emergency Response Component (US$ 0 million)- Component 6: : Climate-resilient upgrading/rehabilitation of selected sections of the Abidjan-Ouagadougou railway |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Industry, Trade and Services,FY17 - Social Protection,FY17 - Transportation |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Solar, Water Supply and Storage, Rail, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
