Cote d’Ivoire Inclusive Connectivity and Rural Infrastructure Project
Sector: Mass Transit • Location: Cote d'Ivoire
Source: World Bank Group
The project will be co-financed by World Bank and Asian Infrastructure Investment Bank (AIIB). It will be a joint co-financing, with AIIB contributing to components 1, 2.1 and 3 (about 48 percent for AIIB and 52 percent World Bank). The project is structured around six components:- Component 1: Inclusive and Resilient Rural Connectivity Infrastructure [rehabilitation/maintenance of unpaved roads a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project will be co-financed by World Bank and Asian Infrastructure Investment Bank (AIIB). It will be a joint co-financing, with AIIB contributing to components 1, 2.1 and 3 (about 48 percent for AIIB and 52 percent World Bank). The project is structured around six components:- Component 1: Inclusive and Resilient Rural Connectivity Infrastructure [rehabilitation/maintenance of unpaved roads and rivers crossings, construction (including widening the right of way and few changes in alignment) of a paved road, small storm-water basins and catchments to capture runoff water]- Component 2. Rural socio-economic infrastructure [markets: construction of sheds and small storage and processing facilities, internal pathways, water and sanitation facilities, drainage infrastructure; pastoral connectivity: rehabilitation of transhumance corridors, including livestock channeling hedges, fodder plots, temporary night parks, temporary shelters for shepherds, as well as water points; schools and health centers: construction/rehabilitation of water/handwashing points and toilets, fences, energy connection (solar for off-grid areas), amenities: construction and rehabilitation of recreation spaces, spot lighting etc.; water/energy: small water pipe and electricity extensions; climate change: tree planting in or around the villages]- Component 3: Capacity building, support to Institutional framework and sector strategy [capacity building for public entities and private actors to implement components 1, 2 & 3; TA for the finalization of the rural roads' strategy and road maintenance strategy; road safety and other technical assistance to project implementation]- Component 4: Support to Project Management [Citizen Engagement, M&E, audits, Third-Party Monitoring and contribution to operational costs]- Component 5: Contingent Emergency Response Component (US$ 0 million)- Component 6: : Climate-resilient upgrading/rehabilitation of selected sections of the Abidjan-Ouagadougou railway |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
