Cotton Center Solar Station
Sector: Commercial • Location: Gila Bend, Arizona, United States
Source: McCarthy Building Companies
McCarthy oversaw an 18MW facility installation of 93,000 single-axis mounted silicon photovoltaic (PV) panel system designed to track the sun across the sky on 145 acres. The tracking PV panels were constructed in 1,662 rows, which increases the energy yield by over 15%, and the project is expected to fulfill the needs of more than 4,000 APS customers. The design reduced material and labor require
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | McCarthy oversaw an 18MW facility installation of 93,000 single-axis mounted silicon photovoltaic (PV) panel system designed to track the sun across the sky on 145 acres. The tracking PV panels were constructed in 1,662 rows, which increases the energy yield by over 15%, and the project is expected to fulfill the needs of more than 4,000 APS customers. The design reduced material and labor requirements for APS, and is currently out-performing the model engineered design and producing more energy more efficiently. The Cotton Center Solar Station was the first project to be commissioned under the APS Sun program, paving the way to expand the use and acceptance of photovoltaic technology by other utilities. The project was completed in just over nine months, one month ahead of schedule. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Morphotek’s New Biologics Production Facility
- LabCentral 238, Cambridge, Massachusetts, USA
- Medical and Research Translation (MART) Building, Stony Brook University
- Kite Pharma’s Viral Vector Manufacturing Facility, California, US
- Virginia Cancer Specialists (VCS) Research Facility, Virginia
- Bristol-Myers Squibb Manufacturing Plant, Devens, Massachusetts
- Cambridge Major Laboratories Active Pharmaceutical
