County Ditch 62 Outlet Structure Replacement
Closed · Minnesota · Last reported Jul 2024
Source: Dodge USA
The Major quantities of work include REMOVE DROP STRUCTURE EACH 1; COMMON EMBANKMENT (CV) (P) CUBIC YARD 510; 60 RC PIPE CULVERT DESIGN 3006 CLASS IV LINEAL FEET 136; 12 PRECAST CONRETE HEADWALL EACH 1; 4 PERF. PE PIPE DRAIN LINEAL FEET. 266; RANDOM RIPRAP CLASS III CUBIC YARD 172; RANDOM RIPRAP CLASS IV CUBIC YARD 165; ROLLED EROSION PREVENTION CATEGORY 25 SQUARE YARD 1776
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
- Location
- Red Lake Falls, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about County Ditch 62 Outlet Structure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Major quantities of work include REMOVE DROP STRUCTURE EACH 1; COMMON EMBANKMENT (CV) (P) CUBIC YARD 510; 60 RC PIPE CULVERT DESIGN 3006 CLASS IV LINEAL FEET 136; 12 PRECAST CONRETE HEADWALL EACH 1; 4 PERF. PE PIPE DRAIN LINEAL FEET. 266; RANDOM RIPRAP CLASS III CUBIC YARD 172; RANDOM RIPRAP CLASS IV CUBIC YARD 165; ROLLED EROSION PREVENTION CATEGORY 25 SQUARE YARD 1776 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Red Lake Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Government, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
