County Road 14 Gas Main Extension
Sector: Chemical (Industrial) • Location: Florence, Alabama, United States of America
Source: Dodge
. In general, the project base bid includes approximately 5,450 linear feet of 8" welded steel gas main and a connection to existing gas main. There is an alternate bid that includes approximately 350 linear feet of 8"welded steel gas main, 5,100 linear feet of 8" PE gas main, and connection to existing gas main.
- Status
- Closed
- Sector
- Chemical (Industrial), Government, Road, Steel, Oil and Gas, Manufacturing (Industrial), Commercial, Metal
- Location
- Florence, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about County Road 14 Gas Main Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | . In general, the project base bid includes approximately 5,450 linear feet of 8" welded steel gas main and a connection to existing gas main. There is an alternate bid that includes approximately 350 linear feet of 8"welded steel gas main, 5,100 linear feet of 8" PE gas main, and connection to existing gas main. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Florence |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Government, Road, Steel, Oil and Gas, Manufacturing (Industrial), Commercial, Metal |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
