County Road 140 Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Demolition of an existing bridge and the construction of a new 92-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work in accordance with plans and specifications Holt County, County Road 140 over Minnesoto Creek, Bridge Replacement and Associated Road Work.
- Status
- Closed
- Sector
- Bridge, Road, Commercial, Cement, Government
- Location
- Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about County Road 140 Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition of an existing bridge and the construction of a new 92-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work in accordance with plans and specifications Holt County, County Road 140 over Minnesoto Creek, Bridge Replacement and Associated Road Work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
