County Road 180 Bridge
Sector: Bridge • Location: Carrollton, Missouri, United States of America
Source: Dodge USA
Grading, construction of a 130-foot three-span concrete I-girder bridge, a gravel surface 24 feet wide, and approximately 4,992 cubic yards of embankment in place together with any incidental work on County Road 180 approximately 14 miles north of Norborne on Route D; thence east on County Road 180, 1.5 miles to the bridge. The total length of the improvement is 1,300 feet.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Grading, construction of a 130-foot three-span concrete I-girder bridge, a gravel surface 24 feet wide, and approximately 4,992 cubic yards of embankment in place together with any incidental work on County Road 180 approximately 14 miles north of Norborne on Route D; thence east on County Road 180, 1.5 miles to the bridge. The total length of the improvement is 1,300 feet. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
