logo

County Road 361B over Rocky Creek Bridge replacement

Sector: Bridge • Location: Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

Construction will begin on a project to replace the CR 361B Bridge over Rocky Creek in Taylor County Monday, Nov. 27, 2023. Constructed in 1950, the bridge is reaching the end of its useful life and is due for a full replacement. As part of the project, a long-term detour will begin Monday, Nov. 27. FDOT expects the detour to be in place through spring 2024 while crews perform bridge construction

Project Information FAQ

Project Information

5 Q
The project “County Road 361B over Rocky Creek Bridge replacement” is an infrastructure initiative in the Bridge sector, located in Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction will begin on a project to replace the CR 361B Bridge over Rocky Creek in Taylor County Monday, Nov. 27, 2023. Constructed in 1950, the bridge is reaching the end of its useful life and is due for a full replacement. As part of the project, a long-term detour will begin Monday, Nov. 27. FDOT expects the detour to be in place through spring 2024 while crews perform bridge construction operations, weather and unforeseen circumstances permitting. During the closure, traffic will be detoured as follows: Drivers east of Rocky Creek will detour to Paul Poppell Road, right on Wright Road, left on U.S. 19 and left on Blue Road to reconnect with CR 361B. Drivers west of Rocky Creek will detour to Blue Road, right on U.S. 19, right on Wright Road and left on Paul Poppell Road to reconnect with CR 361B. FDOT selected Anderson Columbia Construction Inc. to complete this $5.4 million project by summer 2024, weather and unforeseen circumstances permitting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data