logo

County Route 1 Reconstruction

Sector: Water Supply and Storage • Location: Stanley, North Dakota, United States of America

Source: Dodge

Project
Bidding

Grading, culverts, aggregate base and aggregate surface on 10.2 miles of County Route 1 beginning at County Route 10 53rd Street NW and ending at US Highway 2. The project will include the following approximate quantities: Common Excavation - Type A - 700,000 CY; Borrow-Excavation - 100,000 CY; Aggregate Base Course CL 5 - 80,000 Tons; Gravel Surfacing - 40,000 Tons; Geosynthetic Material Type G -

Status
Prospective
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Road, Government
Location
Stanley, North Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about County Route 1 Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “County Route 1 Reconstruction” is an infrastructure initiative in the Water Supply and Storage sector, located in Stanley, North Dakota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Grading, culverts, aggregate base and aggregate surface on 10.2 miles of County Route 1 beginning at County Route 10 53rd Street NW and ending at US Highway 2. The project will include the following approximate quantities: Common Excavation - Type A - 700,000 CY; Borrow-Excavation - 100,000 CY; Aggregate Base Course CL 5 - 80,000 Tons; Gravel Surfacing - 40,000 Tons; Geosynthetic Material Type G - 180,000 SY; Pipe Conduit multiple sizes - 9,000 LF. The project has a date for substantial compl...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Stanley

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Road, Government

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project