Courthouse Addition and Renovation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The project consists of a 3 Story addition consisting of Insulated Concrete form and face brick. Interior walls are metal stud with drywall. Floor system consist of steel bar joists, steel deck, concrete with wood roof trusses. Existing building is on the historical register. The new addition shall be built first and then the renovation work may be started.
- Status
- Prospective
- Sector
- Steel, Government, Metal, Cement, Commercial, Manufacturing (Industrial)
- Location
- Franklin, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Courthouse Addition and Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of a 3 Story addition consisting of Insulated Concrete form and face brick. Interior walls are metal stud with drywall. Floor system consist of steel bar joists, steel deck, concrete with wood roof trusses. Existing building is on the historical register. The new addition shall be built first and then the renovation work may be started. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Franklin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Government, Metal, Cement, Commercial, Manufacturing (Industrial) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
