Courthouse Center Replacement
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
Removal of abandoned cooling/chiller towers, removal and replacement of existing roof systems at different floor levels, removal and replacement of concrete deck waterproofing, removal and replacement of damaged lightning protection system as per drawings, removal and replacement of pitch pan detailing with fluid applied vertical flashing, and temporary removal and replacement of metal roof screen
- Status
- Closed
- Sector
- Metal, Cement, Government, Commercial, Manufacturing (Industrial)
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Courthouse Center Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of abandoned cooling/chiller towers, removal and replacement of existing roof systems at different floor levels, removal and replacement of concrete deck waterproofing, removal and replacement of damaged lightning protection system as per drawings, removal and replacement of pitch pan detailing with fluid applied vertical flashing, and temporary removal and replacement of metal roof screen panels enclosing the mechanical equipment on the roof. Repair of any parapet damaged, where need... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
