Courthouse Commons Tunnel
Sector: Power Generation (CCGT) • Location: San diego, California, United States of America
Source: Clark Construction
Courthouse Commons Tunnel is an inmate transfer tunnel between the county jail and the state courthouse. The tunnel is 330 linear feet long, with a 25-foot diameter. Reinforced by drilled steel piles and lagging, the transfer shaft is 18 feet wide, 50 feet long, and 58 feet deep. Additional scope of work includes renovations to the county jail basement and the installation of new elevators; securi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Courthouse Commons Tunnel is an inmate transfer tunnel between the county jail and the state courthouse. The tunnel is 330 linear feet long, with a 25-foot diameter. Reinforced by drilled steel piles and lagging, the transfer shaft is 18 feet wide, 50 feet long, and 58 feet deep. Additional scope of work includes renovations to the county jail basement and the installation of new elevators; security and mechanical, electrical, and plumbing (MEP) systems; and detention-style ceilings. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- TENANT IMPROVEMENT FOR A NAIL SALON, ELECTRICAL, VENT IN BATHROOM
