Courthouse Faade Stabilization Phase 1
Sector: Electric Vehicles (EVs) • Location: Media, Pennsylvania, United States of America
Source: Dodge
Capitol/ Courthouse/City Hall. Bids to Owner Public - Local December 09 at 11:00 AM (EDT)
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Water Supply and Storage, Power Generation (CCGT), Warehouse, Forest Products and Packaging, Metal, Consumer Products, Automotive, Waste Processing and Treatment, Cement, Steel, Rail, Manufacturing (Industrial), Residential, Power Transmission, Commercial, Road, Government
- Location
- Media, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Courthouse Faade Stabilization Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Capitol/ Courthouse/City Hall. Bids to Owner Public - Local December 09 at 11:00 AM (EDT) |
Original sector | Industry, Trade And Services |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Media |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Water Supply and Storage, Power Generation (CCGT), Warehouse, Forest Products and Packaging, Metal, Consumer Products, Automotive, Waste Processing and Treatment, Cement, Steel, Rail, Manufacturing (Industrial), Residential, Power Transmission, Commercial, Road, Government |
Article published date | 2026-10-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
- Sierra Regency Roof Eve Extensions
- 466135 CLOUD PL NE Local Roadway Paving Restoration
- 378944 Alley-47076042 Citywide Alley Restoration
- Community Food Projects Competitive Grant Program
- Hydrogen Delivery Technologies
