Cove Point Condominium Building
Sector: Manufacturing (Industrial) • Location: Virginia Beach, Virginia, United States of America
Source: Dodge USA
Renovate kitchen, primary bathroom and guest bathroom. Remove partial section of load bearing wall from kitchen to living room. Install new LVP flooring throughout unit except in bathrooms which will be tiled. Paint entire unit. Number Of Stories Above Grade: 1
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Commercial, Residential
- Location
- Virginia Beach, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cove Point Condominium Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Renovate kitchen, primary bathroom and guest bathroom. Remove partial section of load bearing wall from kitchen to living room. Install new LVP flooring throughout unit except in bathrooms which will be tiled. Paint entire unit. Number Of Stories Above Grade: 1 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Virginia Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Residential |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
